Home> News> MDL-150X2 drilling rig shipped to Taicang
July 07, 2023

MDL-150X2 drilling rig shipped to Taicang

Settings:
XPB-90 high pressure pump, 6 cubic air compressor, Mud Pump ,cement mixing tank, one gas storage tank
Construction steps:
1. The construction site is arranged and levelled, and the pile positions are arranged and marked with sticks according to the drawings.
2. After the rig is in position, use a level to adjust the Angle of the rig's propulsion frame. If there is a high or low level, use the leg to adjust.
3, connect a Drilling Rod and drilling pipr, open the air compressor, high pressure pump for pressure test.
4, after the completion of the pressure test, the drill pipe of the good point is drilled successively, and the Drill Machine is quickly drilled to the required depth, and then the rotary injection operation is carried out. Lifting speed 15cm/min Rotational speed 25r/min Cement slurry pressure 28MPa Air pressure 0.7MPa
5, pay attention to the regrouting situation, the drilling rig after lifting and spraying a drill pipe to remove the drill pipe and clean, prevent
Cement solidified in the drill pipe hole and blocked the drill pipe.
6. Lift to one meter above the ground to stop the shotcrete, pull out the drill pipe, and move the machine to the next pile site for construction.
7. Insert section steel at 45°

8, noon rest and night before work to clean the high pressure pump, drill pipe, high pressure pipe with water to prevent the stop time is too long cement slurry blocking the pipeline and drill pipe.

Last News 311 1 1

Share to:

LET'S GET IN TOUCH

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send